NEWS CELEBRITY ENTERTAINMENT FASHION HEALTH HOOK UP LEAKED LIFESTYLE MUSIC RELATIONSHIP VIDEOS

Saturday, 28 March 2020

Lagos to close Marina bridge for six months

Get Best Daily Health Tips Here
The Lagos State Government will be closing down Marine Bridge partially for repairs from 8.00 PM on Saturday March 28, 2020 to Saturday, August 15, 2020.

A statement From the Ministry of Transportation disclosed that the construction works by the Federal Ministry of Works and Housing will replace the worn-out elastomeric bearing, and expand the metallic joints on the bridge. Other repair works include; construction of drain gully, jacketing, skin repairs of the piers and laying of asphalt.

The repair works which will take duration of 20 weeks would be done in two phases to ease traffic movements. The first half of the construction works will last for the first 10 weeks, thereafter; the second half would commence equally and last for 10 weeks.

The closure has been slated between 8.00PM and 8.00AM daily to ensure there is smooth and uninterrupted flow of the repair works, therefore road users are advised to comply with the traffic diversions to minimize inconveniences in movements, as they will be allowed to ply only the available sides of the roads while the construction works lasts.



0 comments:

Post a Comment

Recent Comments